adlishah.com

adlishah.comadlishah.comadlishah.com
  • Home
  • Education
  • Career
  • Projects
  • Competencies
  • Certifications
  • Other Involvement
  • More
    • Home
    • Education
    • Career
    • Projects
    • Competencies
    • Certifications
    • Other Involvement

adlishah.com

adlishah.comadlishah.comadlishah.com
  • Home
  • Education
  • Career
  • Projects
  • Competencies
  • Certifications
  • Other Involvement

MY PROJECTS

MAYFLOWER

Waterline Leak Tester

MAYFLOWER

Short-term test boxes pilot run on an overhead carousel for new assembly build

Project Manager for Quality Test Systems for two new assembly lines within the Refrigeration Division. Test Systems included proactive assembly testing, short-term test carousel and long-term test lab.

TORINO

Waterline Leak Tester

MAYFLOWER

Running beta test scripts on a new electronic board to verify API and OP code commands

New Product Integration for Built-in Refrigeration assembly line. Project lead for upgrading End of Line (EOL) test boxes capabilities and installation of new door testers. Configuring new test scripts for new electronic boards

Waterline Leak Tester

Waterline Leak Tester

Waterline Leak Tester

Quality project to reduce Service Incident Rate (SIR) for customers. Quality Test Systems lead for project, ensuring all interconnecting systems are functioning within constraints. Onsite OEM validation of machine's Cp/Cpk (Process Capability) 

R600a (Refrigerant)

Factory Distribution Center (FDC)

Waterline Leak Tester

A rotating stationed conveyor of vacuum pumps

US EPA Regulatory Project. Refrigerant change on all assembly lines across NAR (US and Mexico). Lead Process Quality activities for project, ensuring 'VoC' and 'VoP' is within SPC and Cp/Cpk capabilities through six sigma methodologies

Factory Distribution Center (FDC)

Factory Distribution Center (FDC)

Factory Distribution Center (FDC)

The launch of a new repacking station for a Factory Distribution Center

A new packaging line for a Factory Distribution Center. Industrial Engineer lead for all 'Kaizen' activities, floor plan layout, Standard of Work, Standard Operating Procedure, operator and maintenance training 

Thermoforming

Factory Distribution Center (FDC)

Factory Distribution Center (FDC)

A new thermoforming machine that forms plastic into specific shapes for downstream production

A new thermoforming machine for a Refrigeration factory. Industrial Engineering lead, ensuring machine operators, materials, and maintenance adhere to Kaizen expectation 'Muri, Muda, Mura'.  Technical input on machine design (Early Equipment Management) for production optimization

Back Shop & Fabrication (Lean Improvements)

Back Shop & Fabrication (Lean Improvements)

Back Shop & Fabrication (Lean Improvements)

Continuous Improvement projects for Back Shop and Fabrication. Implemented Workplace Organization (WO)/Lean Six Sigma activities from 5S  Kaizen, Value Stream Mapping to identify value added and eliminate non-value added activities. Resulting in machine and labor optimization and improved standards and the implementation of best practices 

OBERON

Back Shop & Fabrication (Lean Improvements)

Back Shop & Fabrication (Lean Improvements)

A view from an Automated Guided Vehicle (AGV) cart as it moves on from one station to the next

New Product Introduction (NPI) project for Built-in Refrigeration unit. Manufacturing Engineering lead for all assembly related processes. This includes Work Cell Design, Parts Presentation, Standard Work, Standard Operating Procedure, Value Stream Mapping, 'Spaghetti' diagrams, operator training, pilot runs to product launch


Copyright © 2025 adlishah.com - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept